100 VERSIÓ 2.0
Studies to examine the viability of dividing a Family House into five apartments with common spaces and services.
​
The main goal of the research and proposal is to demonstrate the feasibility of the project to ensure a new long life to the owners.
Chandigarn
workshop
​
URBAN PROPOSAL FOR THE CITY- PORT INTERFACE
​
The Barcelona City-Port interface is under continue transformation. The limit between the urban port and the industrial logistic area is under movement and is being continually displaced south, opposite to urban positions, in search for areas where to minimize conflict between urban and port activities. At the same time, physically constrained the city of Barcelona is in search for space to provide houses to new comers.
This proposal link port and urban interest through the creation of a continue slab that facilities logistic activities under while permits urban activities above, provide space to enlarge today’s straitjacketed transport infrastructures and solve the link between the city and the bigger park in town, Montjuïc.
​
​
1000 Versió 2.0
BARCELONA: SMART SALTY SPICY
Location: Riudecanyes
Surface: 7500 m2
Year: 2015
Collaborators: Sònia Lamesa,
Teresa Milián & Carla Lladó
​
Location: Port of Barcelona, Spain
Year: 2011
Architects: Carlota Casanova, Daniel Lorenzo
Mamen Domingo, Ernest Ferrè,
​



A TREE AND A SHELTER
Location: Unitat Predepartamental d’Arquitectura,
ETSA Universitat Rovira i Virgili
Year: 2014
Professors: J. M. Toldrà; J. Farreny; D. Lorenzo; F. Cifuentes; R. Miralles
L
CA
O
Vila-Seca Oberta​
​
2022 - 2030
Re-naturalization and connection of the surroundings of the municipal market and the future "tramcamp" park.
​
One of the main points of the project was to give principal character to nature. With the improvement of the mobilitation possibilities, we wanted to enhance the connection between the pedestrian and cycling areas. Fences and other barriers were eliminated, so the main facilites and the Vila-Seca area can be reached easier.
​
​
Vila-Seca Oberta
Location: Vila-Seca, Tarragona
Budget: €
Floor Area: m2
Year: 2022
Collaborators: Inés de Rivera, Núria Salvadó, Olaf Puente, GRAPH Visual Studio
​
FUTURE PROJECT

STRATEGY A
Deurbanization
STRATEGY C
Permeability




STRATEGY B
Re-naturalization
STRATEGY D
Coexistence mobility

SITE PLAN
VILA-SECA OBERTA
2022 - Permeability

2022 - Coexistence mobility

2022 - Re-naturalization

2022 - Deurbanization

2030

2030

2030

2030





Acoustic tunel panels
El Tram del Parc
"Slope" section and vegetation
"Green walls" to filter the noise